RadarSuite
Start free trialAI Radar · Sample
Sample Radar from the public record. Fictional case, AI Radar working paper v5.0, Section 6.5 and Table 6. Norvane Industries is a fictional company. Every input is invented to show the full computation. Ring 3 is scored from public sources only, because proprietary strategy, budget and program data cannot appear in a published Radar. A Radar run on a firm's own documents, with retrieval over them, reads the company ring and the stages far more precisely.

Norvane Industries

Read of October 13, 2026 (baseline) · Sample · AI Radar 5.0 · frontier of Nov 2026

Full diagnostic. AI Radar 5.0 sample: Norvane Industries, a fictional company. Worked case, AI Radar working paper v5.0 (Sawhney, November 2026), Section 6.5 and Table 6.

Caveat

A sample Radar from the public record

Fictional case, AI Radar working paper v5.0, Section 6.5 and Table 6. Norvane Industries is a fictional company. Every input is invented to show the full computation.

Summary

Norvane Industries is a fictional company. Every input is invented to show the full computation of the four indices, which public records cannot support.

Norvane invests about four fifths of what its ambitions require. Most of what it invests is in the right priority classes, and one priority, Operations in Field Services, has no program at all. Three quarters of the money is in programs that can show a measurement, but three fifths of it only assists a person, where leading companies put four fifths into reshaping work and inventing offerings. And an eighth of the spend is built at the wrong level: the same forecasting, maintenance, service, and invoice jobs are built twice, and consolidating them would release about a third of the funding gap before the board is asked for money.

1. The company

Norvane Industries is a fictional industrial group with eight billion dollars of revenue and three businesses: Flow Control (pumps and valves, 4.0 billion dollars, a growth posture), Climate Systems (commercial climate equipment, 2.5 billion dollars, a transformation posture), and Field Services (maintenance contracts, 1.5 billion dollars, a defensive posture). The parent runs finance, people operations, and risk for all three. Its ledger holds 31 programs with 61.3 million dollars of spend, and 4.1 million dollars of enablement spend. People are counted at a standard rate of 0.2 million dollars for each full-time equivalent.

2. The four indices

MarketingSalesPricingDiscoveryDevelopmentEmbedded IntelligenceSupply ChainOperationsCustomer ServicePeopleFinanceRisk12345

Figure 1. The recommended allocation of AI capital, attention and governance for Norvane Industries, twelve dimensions on the 1-to-5 scale.

Table 1. The four indices

IndexValueRange and companionsReading
AII, investment7865 by the peer methodShort. Actual spend is 65.4 million dollars against 84 million required by the program method
AAI, alignment8477 to 88 under the three weight conventions; 4 percent of spend in refused dimensions; one concentrate dimension with no programTilted. The drift between businesses is 2 points
AMI, maturity7358 by count of programs; 50 percent of spend has reported outcomes; mode mix 59 percent assist, 23 percent run, 19 percent invent (rounded, so the three sum to 101)Most of the money is past the pilot line, and three fifths of it only assists a person
ALI, layer87Duplicate spend 5.9 million dollars; over-centralized spend 1.8 million dollars; centralization gap of minus 28 points; one program to replicateFragmented. 19 percent of spend is shared or corporate, and the tests warrant 46 percent

The first two indices together give the position. Short investment that is aligned needs funding, and the decision belongs to the board; consolidation comes first, because it releases people and budget that the company spends twice.

3. What the case changed in the method

The case also tested the method, and it changed two rules. Computed dimension by dimension, the same ledger gave an alignment of 63, because Climate Systems spends heavily on one priority dimension; the index is therefore computed by priority class. And the enterprise assistant could not be allocated to dimensions without usage data, so the cross-dimension row is left out of the Alignment Index at a first reading and included in the other three.